IIWWTF

Project NameIIWWTF
ClientASHGHAL
ContractorLarsen & Toubro Ltd
ApplicatorStream Specialized Services
ProductsGT Spraycoat PU100
Area50,000 sq. m
Project IIWWTF Phase 1, Stage 2

PROJECT INFO

The Integrated Industrial Wastewater Treatment Works (IIWWTW) Phase 1 is one of its kind as an Industrial Wastewater Treatment plant as it will provide treatment for up to 10,000 m3 /d of industrial wastewater arising from light industries generated within the Doha Industrial Area Catchment, brought in by tanker

THE SOLUTION

ASAS CCF Technical team visited the site to assess the substrate condition. The surface for this project will have exclusive requirement to resist the aggressive Chemicals which contaminate the waste water. Under these conditions, Sustainability and durability were Pre-requisites.In compliance to QCS 2014 class A requirements, GT Spraycoat PU100 was proposed by ASAS CCF which was approved by the client.

THE BENEFITS

Installation of GT Spraycoat PU100 will provide excellent chemical and water resistance. It is highly resistant to a wide variety of Acid, Alkalis, Salts, Seawater, Sewage and Industrial Chemicals. Weight gain in ASTM D 543 tests is typically < 0.5%. This prevents degradation of the film and allows long term saturated weight gain < 0.86% as per procedure 7.4 (Long Term Immersion)